top of page

Aircraft Maintenance Hangar

soil stabilisation, cut & fill, groundwork, drainage, engineering, sub base
soil stabilisation, cut & fill, groundwork, drainage, engineering, sub base
  • Sub structure & drainage design
     

  • Ground engineering, testing & modelling
     

  • 70,000 m3 cut & fill
     

  • Soil stabilisation working platforms, sub base & apron formation
     

  • Drainage (surface, water inc attenuation and soakaways, foul water)

  • BWIC incoming statutory services
     

  • Groundwork
     

  • External works (hard paving, soft landscaping & aprons)

bottom of page